Emergency response +31 10 454 99 11

We supplied and assited with the installation of 45.000m2 of Geolock, a vertical impermeable 2mm HDPE seal, inside a cement bentonite walls to assure watertightness for a long cut below groundwater of the new extension of the A4 highway in the Netherlands. Maximum installation depth was 18m

Geolock installation is part of our segment barriers.

Back to top

Emergency response

Call SMIT 24/7 at
+31 10 454 99 11

Help us to help you.
Keep the following information at hand when you contact us in case of an emergency:
Initial info:
What? Where? When?

Type and cause of accident:
Fire – collision - grounding

Known damage:
What is the known damage? Where is it located?

Contact details:
Which contact details can we use at all times?

24/7