To main content

Mariolina de Carlini

Emergency response

Call SMIT 24/7 at
+31 10 454 99 11
salvage@smit.com


Help us to help you.
Keep the following information at hand when you contact us in case of an emergency:
Initial info:
What? Where? When?

Type and cause of accident:
Fire – collision - grounding

Known damage:
What is the known damage? Where is it located?

Contact details:
Which contact details can we use at all times?

On the 30th of October 2013 the bulk carrier ‘Mariolina de Carlini’, 87,734 DWT, ran aground just outside Freetown, Sierra Leone. The vessel was fully laden with iron ore and grounded on the rocks.

SMIT Salvage was directly notified about the incident by its sister company Smit Lamnalco, which operates tugs for several terminals in Freetown. A salvage team from the Netherlands mobilized overnight to be able to carry out an inspection of the vessel the next day. In the meantime SMIT Salvage was awarded the LOF contract by the owners.

Initial inspections showed that the vessel was heavily stuck on the bow and the first three frames were severely damaged. The salvage team on board made precautionary arrangements at the breached compartments to avoid further damage and to maintain as much buoyancy as possible.

At the same time, the 180TBP anchor-handling tug ‘Union Sovereign’ was mobilized towards the casualty location to assist with the refloating attempt. Additionally, Smit Lamnalco's local 62TBP tug ‘SMIT Montserrat’ was on stand-by and ready to assist with the operation. On the 4th of November during springtide, everything was in place and after sheering and pulling the ‘Mariolina de Carlini’ was successfully refloated. Immediate inspections at the emergency anchorage showed that the vessel was in a relatively stable and safe condition. Subsequently, the vessel sailed at a reduced speed with the assistance of a SMIT Salvage riding crew and with an escort from the ‘Union Sovereign’ to Cartagena, Spain, to discharge the cargo.

During the voyage to Cartagena ROV surveys of the vessels bottom were carried out, witnessed by the Class surveyor. After the discharge operation several dive inspections were performed to ensure the safety of the vessel for her transit to dry dock. Finally the Mariolina de Carlini was escorted to Setubal, Portugal where she was safely delivered to her owners and entered into dry dock for repairs.

Related projects

Selected filters
SMART-0903

Smart

During heavy swells on the morning of the 19th of August the bulk carrier 'Smart', 150,000 DWT loaded with 147,000 tons of coal, left the port of Richards Bay, South Africa heading for China. Soon, however, the swell became too much and the vessel grounded next to the channel, less than 250 m from the coast. Just hours after the grounding, the vessel broke in two.

USS_Guardian

USS Guardian

On the 29th of January the ‘USS Guardian’, a mine countermeasures ship of the US Navy, grounded on the North Western tip of the Tubbataha Reef in the Sulu Sea. The prevailing North East monsoon, sea and swell impacting on the vessel were causing her to move up on the reef and she was deteriorating, hence a swift operation was required to avoid the risk of pollutants being released into the environment.

Jin_Tai

Jin Tai

The beginning of 2012 involved the salvage case of the backacter bucket dredger ‘JIN TAI’. This backhoe dredger was working on the construction and expansion of the newly built container port of Coega near Port Elizabeth (South Africa), when it experienced a problem with one of the vessels’ legs. A cable attached to one of the three spud piles came loose, causing one of the legs to give way and the engine room start flooding.

Kulluk_BP_2_2013

Kulluk

In late December 2012 when the conical drilling rig ‘Kulluk’, 9,900 DWT, was under tow to Seattle the tow connection parted in a severe storm in the Gulf of Alaska. Despite efforts to re-establish the tow connection the rig eventually grounded on the pristine coast of Sitkalidak Island, which is part of Kodiak Island.

Rig_Noble_Regina_Allen_1_2012

Rig Noble Regina Allen

In December 2012 the newly built rig 'Noble Regina Allen', constructed at Jurong Shipyard Singapore, was undergoing operational tests. The jack-up rig suffered from a mechanical failure on one of the jacking systems during the pre-load test. This failure resulted in the rig tilting severely and the bow section submerging into the sea until the rig came to rest on the seabed.

Chamarel_2012

Chamarel

The French cable-laying vessel 'Chamarel', 5,900 DWT, suffered an engine room fire off the Namibian coast, which spread rapidly and eventually burnt down the accommodation. The vessel drifted to shore were it grounded on the sandy beach of the Skeleton Coast, a very remote location.