On the 30th of October 2013 the bulk carrier ‘Mariolina de Carlini’, 87,734 DWT, ran aground just outside Freetown, Sierra Leone. The vessel was fully laden with iron ore and grounded on the rocks.

SMIT Salvage was directly notified about the incident by its sister company Smit Lamnalco, which operates tugs for several terminals in Freetown. A salvage team from the Netherlands mobilized overnight to be able to carry out an inspection of the vessel the next day. In the meantime SMIT Salvage was awarded the LOF contract by the owners.

Initial inspections showed that the vessel was heavily stuck on the bow and the first three frames were severely damaged. The salvage team on board made precautionary arrangements at the breached compartments to avoid further damage and to maintain as much buoyancy as possible.

At the same time, the 180TBP anchor-handling tug ‘Union Sovereign’ was mobilized towards the casualty location to assist with the refloating attempt. Additionally, Smit Lamnalco's local 62TBP tug ‘SMIT Montserrat’ was on stand-by and ready to assist with the operation. On the 4th of November during springtide, everything was in place and after sheering and pulling the ‘Mariolina de Carlini’ was successfully refloated. Immediate inspections at the emergency anchorage showed that the vessel was in a relatively stable and safe condition. Subsequently, the vessel sailed at a reduced speed with the assistance of a SMIT Salvage riding crew and with an escort from the ‘Union Sovereign’ to Cartagena, Spain, to discharge the cargo.

During the voyage to Cartagena ROV surveys of the vessels bottom were carried out, witnessed by the Class surveyor. After the discharge operation several dive inspections were performed to ensure the safety of the vessel for her transit to dry dock. Finally the Mariolina de Carlini was escorted to Setubal, Portugal where she was safely delivered to her owners and entered into dry dock for repairs.

Related projects

Selected filters
MSC_Napoli_3

MSC Napoli

Container ship ‘MSC Napoli' suffered severe damage during a violent storm in the English Channel on 18 January 2007. SMIT Salvage was contracted to salvage the vessel which involves the discharge of all 2300 containers and the ultimate refloating of the vessel.

dina_barge

Dina Barge

'Dina Barge' (diameter: 120 x 33.5 x 7.6 m), laden with a cargo of 12 hulls (6500 tons ttl), was on route from the Far East to Europe when, during severe monsoon conditions, it broke off from the main vessel 'YM Shanghai'. It finally ran aground 90 km south of Mumbai (India).

UND_1

UND Adriyatik

Ro-ro vessel ‘UND Adriyatik' was suffering from a fire on board, off the coast of Pula, Croatia.

Mighty_Servant_3

Mighty Servant 3

In the morning of 6 December 2006 semi submersible vessel 'Mighty Servant 3' developed a list and sank off the port of Luanda, Angola, after the offloading of drilling platform ‘Aleutian Key'.

Ocean_Warwick_Rita

Hurricane Rita

Shortly after Hurricane Katrina, a weakened but still powerful Hurricane Rita altered its course to threaten residents in Louisiana and Texas. Rita was the fifth major hurricane in the U.S.A. of that season.

Selendang_Ayu

Selendang Ayu

The Malaysian flagged 225 metres long cargo vessel suffered a main engine breakdown, drifted without power, grounded and eventually broke in two off the coast of Western Unalaska Island.