To main content

Dina Barge

Emergency response

Call SMIT 24/7 at
+31 10 454 99 11
salvage@smit.com


Help us to help you.
Keep the following information at hand when you contact us in case of an emergency:
Initial info:
What? Where? When?

Type and cause of accident:
Fire – collision - grounding

Known damage:
What is the known damage? Where is it located?

Contact details:
Which contact details can we use at all times?

'Dina Barge' (diameter: 120 x 33.5 x 7.6 m), laden with a cargo of 12 hulls (6500 tons ttl), was on route from the Far East to Europe when, during severe monsoon conditions, it broke off from the main vessel 'YM Shanghai'. It finally ran aground 90 km south of Mumbai (India).

On 12 August 2008 SMIT Salvage was contracted on a basis Lloyds Open Form to refloat the grounded barge.

Two tugs - 'Matsas Star' (120 ton bollard pull) and 'Seacor Valor' (82 ton bollard pull) - from Dubai (UAE) were mobilized to the casualty location in order to refloat her by pulling.

1900 m Dyneema
Dyneema towing cables of respectively 500 m and 1500 m were mobilized from SMIT Salvage locations Rotterdam and Cape Town. The Dyneema with a total length of  1900 m was transported firstly to Dubai and subsequently loaded onto the 'Seacor Valor'.

With the jointed efforts from SMIT's salvage crew from Rotterdam, Singapore and Cape Town the 'Dina Barge' was successfully refloated during the high tide on 31 August 2008.

For SMIT Salvage a unique achievement being the first time a single Dyneema towing cable of 1900 m was used during a refloating operation.

Related projects

Selected filters
SMART-0903

Smart

During heavy swells on the morning of the 19th of August the bulk carrier 'Smart', 150,000 DWT loaded with 147,000 tons of coal, left the port of Richards Bay, South Africa heading for China. Soon, however, the swell became too much and the vessel grounded next to the channel, less than 250 m from the coast. Just hours after the grounding, the vessel broke in two.

USS_Guardian

USS Guardian

On the 29th of January the ‘USS Guardian’, a mine countermeasures ship of the US Navy, grounded on the North Western tip of the Tubbataha Reef in the Sulu Sea. The prevailing North East monsoon, sea and swell impacting on the vessel were causing her to move up on the reef and she was deteriorating, hence a swift operation was required to avoid the risk of pollutants being released into the environment.

Jin_Tai

Jin Tai

The beginning of 2012 involved the salvage case of the backacter bucket dredger ‘JIN TAI’. This backhoe dredger was working on the construction and expansion of the newly built container port of Coega near Port Elizabeth (South Africa), when it experienced a problem with one of the vessels’ legs. A cable attached to one of the three spud piles came loose, causing one of the legs to give way and the engine room start flooding.

Kulluk_BP_2_2013

Kulluk

In late December 2012 when the conical drilling rig ‘Kulluk’, 9,900 DWT, was under tow to Seattle the tow connection parted in a severe storm in the Gulf of Alaska. Despite efforts to re-establish the tow connection the rig eventually grounded on the pristine coast of Sitkalidak Island, which is part of Kodiak Island.

Rig_Noble_Regina_Allen_1_2012

Rig Noble Regina Allen

In December 2012 the newly built rig 'Noble Regina Allen', constructed at Jurong Shipyard Singapore, was undergoing operational tests. The jack-up rig suffered from a mechanical failure on one of the jacking systems during the pre-load test. This failure resulted in the rig tilting severely and the bow section submerging into the sea until the rig came to rest on the seabed.

Chamarel_2012

Chamarel

The French cable-laying vessel 'Chamarel', 5,900 DWT, suffered an engine room fire off the Namibian coast, which spread rapidly and eventually burnt down the accommodation. The vessel drifted to shore were it grounded on the sandy beach of the Skeleton Coast, a very remote location.