Initial info:
What? Where? When?

Type and cause of accident:
Fire – collision - grounding

Known damage:
What is the known damage? Where is it located?

Contact details:
Which contact details can we use at all times?

On Thursday evening 30 July 2009 bulk carrier ‘Full City', 26,758 DWT (in ballast and at anchor off the port of Langesund, Norway, awaiting her berth) was trapped in a sudden storm, causing her anchor to drag, and came to rest on the rocks.

The engine room flooded and the double bottom fuel oil tanks breached which resulted in a major spill. Subsequently, the Norwegian Coastal Administration (NCA) mobilised all available crafts, oil barriers/ booms and anti-pollution equipment in order to battle the pollution.

SMIT Salvage contracted by owners
In the early morning of Friday 31 July, SMIT Salvage was contracted by the owners under a Lloyd's Open Form 2000 Scopic contract. SMIT's Norwegian partner tug and salvage company Buksér og Berging (B&B) was taken on as subcontractor. SMIT and B&B have a longstanding relationship and worked together on several projects such as the ‘Rockness' and most recently in December 2008 the ‘Crete Cement'.

Mobilisation
A salvage team from Rotterdam was immediately mobilised by charter plane, arriving on-site on Friday afternoon. The most essential salvage, pumping and fuel oil recovery equipment was airlifted as well. In the meantime, SMIT and B&B mobilised the DSV ‘BIG', tugs and a tank barge, while the NCA kept on site Coastguard vessel ‘Nornen' and tug ‘Balder'. Salvage operationThe salvage team recovered all remaining heavy fuel oils and other pollutants out of the holds and tanks by means of skimming and pumping. The recovered pollutants were transported to shore and disposed of. Following this, the damaged holds could be repaired. The vessel was then de-ballasted in preparation for a refloating attempt. With the assistance of three B&B tugs, the vessel was successfully refloated in the morning of Monday 17 August. Accordingly, SMIT Salvage towed the ‘Full City' to a more sheltered, deep-water NATO jetty at a distance of approximately nine miles from the grounding site. Upon arrival, in the late afternoon, the salvage team performed a final diving survey after which the vessel was redelivered to the owners.

Related projects

Selected filters
Nordlys

Nordlys

The passenger ferry ‘Nordlys’, which trades along the Norwegian coast from Oslo, reported a fire in the engine room. Sadly, two people died in this fire. The passengers were taken off and emergency teams mobilised.

KOEM_BP_2011

KOEM Kyung Shin

The task was to remove oil from the wreck of the tanker ‘Kyung Shin’. This tanker went down many years ago off the country’s south east coast, in a water depth approaching 100 m.

Mirach_RIMG0012

Mirach

Bulk carrier ’Mirach’ grounded a off the coast of Southern India, just three miles off the port of Trivandrum.

Margaret_barges_2010

Margaret Barge

The ’Margaret’ ran aground on the Cape West Coast, South Africa on 24 June 2009 with a cargo of 12 river barges and two floating docks. She was being towed to the Netherlands when the tug lost her tow in adverse weather conditions.

Divi_Divi

Divi Divi

On 22 October a small commercial aircraft with nine passengers made an emergency landing at sea between Curacao and Bonaire, following a failure in one of the engines. All nine passengers were able to make a safe escape, but the pilot could not be saved in time, and went down with the aircraft.

Full City

On Thursday evening 30 July 2009 bulk carrier ‘Full City', 26,758 DWT (in ballast and at anchor off the port of Langesund, Norway, awaiting her berth) was trapped in a sudden storm, causing her anchor to drag, and came to rest on the rocks.